Debenhams

£80,000

Re-cabling of Alders stores to Debenhams cabling specification Cat5E/6 Systimax Solutions, new data cabinets, backbone cabling and horizontal cabling to all outlets.
Murketts (BMW) Ltd

£30,000

Supply and Installation of Bosch Divar IP camera system with access over LAN and remote.
International Centre for Life

£15,000.00

Car Park - Install dedicated 240v power supplies for CCTV. Zebra Fish Room - Install new lighting and power storage live Zebra fish. Periodic testing and inspection - to carry out 5 year periodic testing and inspection to Bio Science Building - Life Complex.
Jack Humphries & Partners

£11,500

Customs House 110 dual voice/data outlets installed into a listed building. Liaising with BT and Telewest onto box conns/voice port panels, all data including patch panels also hardware/switches by others.
McVickers Ltd

£9,500.00

Site - Holy Jesus Hospital A 120 dual outlet voice/data cabling installation into a listed building in 2 sections. 1 section for University of Northumbria the other for the National Trust. Installation into 2no separate cabinets. Switches by others.
TMD Carat

£150,000.00

UK's first end to end gigaspeed structured cabling installation, serving 1300 information outlets. Co-axial cable and satellite head end installation including dish for terrestial and satellite TV services.
Logica UK Ltd

£40,000.00

1000 Outlet installation of Lucent Technologies Systimax(R) Structured Cabling System.
CPM International

£100,000.00

Installation of Lucent Technologies Systimax(R) Structured Cabling system and Fibre Optic backbones. Installation of 3Com Superstack based token ring network, utilising backbone switching and Transcend RMON network managed hubs.
Fresh Fruit Services Ltd

£90,000.00

Total network installation of Lucent Technologies Optispeed Fibre Backbone and Gigaspeed SYSTIMAX structured cabling systems.
John Lewis Department Stores

£50,000.00

Structured cabling system and Fibre optics maintenance and enhancements.
Bolero International

£30,000.00

Complete IT infrastructure including Lucent SYSTIMAX and power cabling, cabinets, server room false floor and voice over SCS services.
Hotpoint GDA

£30,000.00

Complete refurbishment of IT Dept including new lighting and power scheme and a gigaspeed data cabling network to service 150 users.
24/7 Media Europe Ltd

£20,000.00

200 information outlet installation over 2 floors, fibre optic and copper backbones and cabinets to house network equipment including servers.
Rustler Produce

£18,000.00

Provision of new NT4 server with e-mail and fax enabled to the desktop and software projection unit for presentation purposes. Including network hardware and cabling infrastructure.
Smye Holland Associates

£18,500.00

Provision of new NT network including server and Windows 98 workstations e-mail and fax enabled to the desktop including all network hardware and cabling infrastructure.
Navision Software UK Ltd

£15,000.00

Complete infrastructure for relocation to new floor including fibre optic Cat5E Cabling Sciences cabling, cabinets and 3Com 10/100 switch 3300's.
Iway Ltd

£6,000.00

Cabling Sciences SCS (approx 200 outlets) for internet access at technology centre.
Checkpoint Software Technologies Ltd

£10,000.00

Complete office fit out including new lighting and power scheme and Cabling Sciences structured cabling system.
GDA Northern Ireland

£5,000.00

Lucent Gigaspeed structured cabling system for new distribution centre in Northern Ireland.
The Grove Hotel
Watford
£350,000.00
Installation of Avaya Gigaspeed Excel Cat6 Data Cabling Installation, serving voice and tele-communicaton throughout the whole of the Hotel Installation. Voice and Fibre Optic Backbones linking all areas and provision of audio visual cabling installations, including VGA Cabling, speaker cabling and Sattelite and terestrial TV cabling to all areas
Waitrose
£50,000.00
Installation of Brand-Rex Cat6 Gigaplus installation, serving retail stall, storage and administration to all areas of the stall, Blown Fibre Backbone linking all cabinets.